EOKO CE Certified Anthracite Aluminium Bi-fold Folding Glass Door for Timber Frame Country Cottage Renovation Rustic Home

Product Description

Showcase 1
Showcase 2
Showcase 3
Showcase 4
Showcase 5
Showcase 6

Product Details

Category Material / Type Thickness / Spec Finish & Options
Aluminum Profiles Aluminum Alloy / Aluminium Alloy
6063-T5
1.8mm – 2.0mm Anodized, Silver & Bronze
Powder Coating (Color to Be Confirmed with Buyer)
Electrophoresis, Silver & Champagne
PVDF
Thermally Broken Aluminum System Design for Better Energy Saving Performance
Glass System Float Glass Single Glazing: 5 mm – 15 mm
Double Glazing with 6A / 9A / 12A / 24A Spacer
Clear / Ultra Clear / Tinted / Blue / Green / Coffee Brown / Gray
Insulated Double Glass / Double Insulated Glass
Insulated Triple Glass / Triple Insulated Glass
Product Spec Diagram 1
Product Spec Diagram 2

Customer Case

Customer Case 1
Customer Case 2
Customer Case 3

Casement Window Opening Types

Customized and design window configurations

Casement Type 1
Casement Type 2
Casement Type 3
Casement Type 4
Casement Type 5
Casement Type 6

Argon Gas Filled

No air leakage / No fogging / Quieter high pressure resistance

Argon Gas Filled Insulation Performance

Glass Type

Glass Option 1
Glass Option 2
Glass Option 3

Product Classification Module

One-stop whole house windows and doors

Product Categories Overview
Product Classification Chart

After-Sales Service

If damage occurs during transport, clients should provide clear photos and videos of the packaging, product, and delivery. EOKO will review the order and shipping details and assist with a solution, such as replacement parts, repair guidance, or claim support.

Intact Delivery Guarantee

Products are intact prior to delivery

24 Hours Response

After damage, provide clear photos, and a decision will be made within 24 hours

Replacement Support

Replacement parts will be sent after confirmation

After-Sales Process Guarantee

Packing Method

For different products, we use different packing methods

EPE Foam Packaging

EPE Foam Packaging

Packed With Wooden Frames

Packed With Wooden Frames

Packed In Wooden Cases

Packed In Wooden Cases

Packing Protection Detail
Packaging View 1
Packaging View 2
Packaging View 3
Each product is carefully packed with protective materials and reinforced wooden crates to ensure maximum stability and minimize the risk of damage during transportation and delivery.
Contact Us Banner

Frequently Asked Questions

Quick answers to common questions about ordering, specifications, and delivery

Q What is the Minimum Order Quantity (MOQ)?

Our Minimum Order Quantity (MOQ) is 1 square meter, making it convenient for both residential custom replacements and large-scale commercial projects.

Q What is the standard delivery and lead time?

The typical manufacturing and delivery lead time is approximately 25 days from confirmation of product drawings and technical details.

Q What installation options and support do you provide?

We provide three comprehensive installation options: dispatching the EOKO Chinese Installation Team directly, utilizing our verified Overseas Installation Partner in your country, or receiving remote EOKO Online Installation Support with dedicated technical guidance.

Q How do I get started with an inquiry or order?

Simply contact us with your email address and phone number. If you already have architectural drawings or window schedule specifications, please submit them for an accurate and rapid quotation.

Q What should I do if items are damaged during transit?

If any damage occurs during transport, please provide clear photos and videos of the external packaging, product, and delivery documentation. Our service team will evaluate the case and provide a confirmed solution within 24 hours, including replacement parts or claim handling.

Q What are the specifications of your aluminum profiles and glass?

Our systems utilize high-grade 6063-T5 aluminum alloy with wall thicknesses from 1.8mm to 2.0mm and thermal break engineering. Glazing configurations include float, double, and triple insulated glass with argon gas filling for superior acoustic dampening and energy-saving performance.

Related Products